Miner Rd. & Bear Creek Rd. Bridges Seismic Retrofit Project
The work to be done generally consists of performing seismic retrofit work to prevent collapse on two bridges over San Pablo Creek, at (1) Miner Rd. and downstream at (2) Bear Creek Rd.
Contract Documents
(click to expand/collapse)
Name | Size | ||
Proposal and Sample Contract | 695.1 KB | ||
SP book combined bridges Final | 11.8 MB |