Re-bid - 2024 Annual Pavement Rehabilitation Project
General work description: The work to be performed generally consists of pavement rehabilitation of various streets within the City of Orinda. Such work includes, but is not limited to; mobilization, demobilization, traffic control & construction signage, installation of erosion control measures, removal & replacement of concrete curb & gutter, removal & replacement of concrete valley gutter, construction of concrete curb ramps, construction of AC dikes, base failure repair (digout), base over-excavation if required, removal of asphalt concrete and aggregate base, milling/cold planing, hot mix asphalt (HMA) overlay, micro- surfacing, cape seal, adjustment of utility manhole frames and covers, perpetuating survey monuments, adjustment of valve boxes, storm drain pipe rehabilitation, installation of theromoplastic traffic stripes, thermoplastic pavement markings, blue reflectors, and crosswalks; production of as-built drawings, production of pothole data, removal & installation of traffic signs, constructing bioretention basin, landscaping, excavation, installation of filtering media, plantings, and associated infrastructure to support water retention and treatment, filing of appropriate record documents with County recorder’s office, and all other work as shown on the plans and as described in the Caltrans Standard Specifications and these Special Provisions to provide a complete project.
Plans
(click to expand/collapse)

Name | Size | ||
2024 Annual Pavement Rehabilitation Project Plan_02.18.2025_Signed | 11.6 MB |