Re-bid - 2024 Annual Pavement Rehabilitation Project

General work description: The work to be performed generally consists of pavement rehabilitation of various streets within the City of Orinda. Such work includes, but is not limited to; mobilization, demobilization, traffic control & construction signage, installation of erosion control measures, removal & replacement of concrete curb & gutter, removal & replacement of concrete valley gutter, construction of concrete curb ramps, construction of AC dikes, base failure repair (digout), base over-excavation if required, removal of asphalt concrete and aggregate base, milling/cold planing, hot mix asphalt (HMA) overlay, micro- surfacing, cape seal, adjustment of utility manhole frames and covers, perpetuating survey monuments, adjustment of valve boxes, storm drain pipe rehabilitation, installation of theromoplastic traffic stripes, thermoplastic pavement markings, blue reflectors, and crosswalks; production of as-built drawings, production of pothole data, removal & installation of traffic signs, constructing bioretention basin, landscaping, excavation, installation of filtering media, plantings, and associated infrastructure to support water retention and treatment, filing of appropriate record documents with County recorder’s office, and all other work as shown on the plans and as described in the Caltrans Standard Specifications and these Special Provisions to provide a complete project.

Status

Accepting Bids

Prebid Date 3/4/25 10:00am
Bid Date 3/18/25 3:00pm

Company & Contacts

City of Orinda
Ha Nguyen  
925-949-9776

Location

City of Orinda

Documents

Engineer's cost estimate (Base Bid): $3.0 million

A pre-bid meeting will be held on Tuesday, March 4, 2025, at 10:00 a.m. at the City Offices, (Planning Conference Room) to cover project construction. Prospective bidders attendance is recommended but not mandatory.