Camino Pablo Pathway Los Amigos Court to Manzanita Drive Project
The work to be done generally consists of removing existing asphalt concrete pathway, grading, earthwork and installing aggregate base, hot mix asphalt, for a new HMA pathway and concrete landings with detectable warning surfaces at each intersection. The work shall also include protection of existing storm drain and utilities, clearing, grubbing, tree and root protection, and minor adjustments of existing electric boxes and vaults.
Specifications
(click to expand/collapse)
Name | Size | ||
Camino Pablo Pathway 2024 Specifications Final | 1.3 MB |