Camino Pablo Pathway Los Amigos Court to Manzanita Drive Project

The work to be done generally consists of removing existing asphalt concrete pathway, grading, earthwork and installing aggregate base, hot mix asphalt, for a new HMA pathway and concrete landings with detectable warning surfaces at each intersection. The work shall also include protection of existing storm drain and utilities, clearing, grubbing, tree and root protection, and minor adjustments of existing electric boxes and vaults.

Status

Bidding Closed

Prebid Date 10/8/24 10:00am
Bid Date 10/22/24 2:00pm

Company

City of Orinda

Location

City of Orinda

Engineer’s cost estimate: $110,000