2023 Annual Storm Drain Repair Project
The work to be done generally consists of rehabilitating approximately 450 Linear Feet of storm drain pipes using trenchless rehabilitation methods, such as Cured-in-Place-Pipe (CIPP) Liner, slip lining, PVC Liner etc. Approximately 35 linear feet of storm drain pipe will be removed and replaced with open trench, including, bedding, trench backfill and pavement restoration.
Status
Bidding Closed
Prebid Date | 2/27/24 10:00am |
Bid Date | 3/12/24 2:00pm |
Location
City of Orinda
Engineer's cost estimate: $380,000
A pre-bid meeting will be held on Tuesday, February 27, 2024 at 10:00 a.m. at the City Offices, 22 Orinda Way, Orinda, CA 94563 to cover project construction. Prospective bidders attendance is recommended but not mandatory.