2023 Annual Storm Drain Repair Project
The work to be done generally consists of rehabilitating approximately 450 Linear Feet of storm drain pipes using trenchless rehabilitation methods, such as Cured-in-Place-Pipe (CIPP) Liner, slip lining, PVC Liner etc. Approximately 35 linear feet of storm drain pipe will be removed and replaced with open trench, including, bedding, trench backfill and pavement restoration.
Addendum 1
(click to expand/collapse)
Name | Size | |||
Addendum 1 for 2023 Annual SD Repair Project | 2.0 MB |