2023 Annual Pavement Rehabilitation Project
The work to be performed generally consists of pavement rehabilitation and storm drain improvements of various streets within the City of Orinda. The pavement treatment methods include Mill & Overlay, Reconstruction, and Micro Surfacing with base failures. Work to be performed also includes replacing storm drain pipes by open trench or trenchless technology, replacement of asphalt dikes, pavement striping & markings, lowering and raising of utility covers, locating and preserving survey monuments and filing of appropriate record documents with County recorder’s office.
Addendum 1
(click to expand/collapse)
Name | Size | |||
2023 Annual Pavement Rehab Project - Addendum #1 | 8.1 MB |
Addendum 2
(click to expand/collapse)
Name | Size | |||
2023 Annual Pavement Rehab Project -Addendum #2 | 93.0 KB |
Addendum 3
(click to expand/collapse)
Name | Size | |||
2023 Annual Pavement Rehab Project - Addendum #3 | 481.2 KB |