Lavenida Culvert Repair

The  work  to  be  done  generally  consists  of  installing  coffer  dams  and  creek  diversion to allow replacement of the invert of a 120 inch± diameter corrugated metal storm drain pipe culvert with reinforced concrete. Work also consists of excavating embankments to form and pour new concrete  headwalls  with  decorative  architectural  treatment.   Expect  dewatering  and  pumping  to  be  necessary. Comply with the permits, licenses, agreements, and certifications (PLACs) and the June 15 ‐ October 15 in‐creek work window. Tree removals, tree trimming, and vegetation removal are required as well.

Status

Bidding Closed

Prebid Date 3/24/22 10:00am
Bid Date 4/12/22 2:00pm

Company & Contacts

City of Orinda
Farah Khorashadi- fkhorashadi@cityoforinda.org  
(925) 253-4279

ENGINEER’S ESTIMATE: $645,000