North Ln. Slip Lining 48” Strom Drain Project #5015
The work to be done generally consists of rehabilitating approximately 250 lineal feet of 48” storm drain pipe using 36” fused solid HDPE slip lining, including grouting, traffic control and temporary check dam/stormwater bypass.
Status
Bidding Closed
Prebid Date | 7/24/24 9:00am |
Bid Date | 8/6/24 2:30pm |
Location
City of Orinda
Engineer's cost estimate: $250,000
A pre-bid meeting will be held on Wednesday, July 24, 2024 at 9:00 a.m. at the work location, near 7 North Ln., Orinda, CA 94563 to cover project construction. Prospective bidders attendance is recommended but not mandatory.