North Ln. Slip Lining 48” Strom Drain Project #5015

The work to be done generally consists of rehabilitating approximately 250 lineal feet of 48” storm drain pipe using 36” fused solid HDPE slip lining, including grouting, traffic control and temporary check dam/stormwater bypass.

Status

Bidding Closed

Prebid Date 7/24/24 9:00am
Bid Date 8/6/24 2:30pm

Company & Contacts

City of Orinda
Jihawna Johnson  
(925) 528-6716

Location

City of Orinda

Engineer's cost estimate: $250,000

A pre-bid meeting will be held on Wednesday, July 24, 2024 at 9:00 a.m. at the work location, near 7 North Ln., Orinda, CA 94563 to cover project construction. Prospective bidders attendance is recommended but not mandatory.